Underground Distribution Line Laying Worker
ちちゅうはいでんせんふせつさぎょういん
Industry & Occupation
Classification
Summary
Underground distribution line laying workers lay distribution cables underground under the instructions of power companies and others to construct and maintain distribution infrastructure. This is a specialized profession.
Description
Underground distribution line laying workers perform a series of operations in the underground conversion or renewal of distribution networks, from trench excavation to conduit laying, cable pulling, jointing, concrete encasement, and road surface restoration. They are required to operate heavy machinery, perform surveying, handle power cables, manage on-site safety, and coordinate with construction supervisors. Selecting construction methods based on soil conditions and obstacles, as well as quick responses to unforeseen troubles, are also important.
Future Outlook
With the growing demand for renewing aging power infrastructure and the spread of renewable energy, the demand for laying underground distribution lines is increasing. Advancements in safety improvements and unmanned technologies are also progressing, and the expertise of technicians is expected to be valued even more.
Personality Traits
Cautious and meticulous / Good cooperativeness / Physically fit / Strong sense of responsibility
Work Style
Day shift / On-site stationed / Outdoor work / Safety equipment required / Shift work
Career Path
Apprentice worker → Skilled worker → Foreman worker → Construction management technician → Site supervisor
Required Skills
Cable connection / Conduit laying and cable pulling / Excavation and restoration using trenching method / Heavy equipment operation / Surveying (level measurement)
Recommended Skills
CAD (wiring route diagram creation) / Concrete injection technology / Safety and health management / Underground exploration technology
Aptitudes (Strengths Preferred)
| Item | Description |
|---|---|
| Adaptability | Quick adaptation to changes in weather and ground conditions is necessary |
| Attention to Detail & Accuracy | Because misalignment of cable laying positions can lead to obstacles |
| Physical Stamina & Endurance | Physical strength is required for heavy machinery operation and long hours of outdoor work |
| Problem Solving | Because responses to underground obstacles and unexpected situations are required |
| Stress Tolerance | Because there is significant pressure from deadlines and environmental changes |
| Collaboration & Teamwork | Because work is performed in cooperation with multiple people |
Aptitudes (Weaknesses Acceptable)
| Item | Description |
|---|---|
| Creativity & Ideation | Because the work follows fixed procedures |
Related Qualifications
- First-Class Electrician
- Second-Class Electrician
- Vehicle-Mounted Construction Machinery Operation Skills Training
Aliases
- Underground Distribution Line Worker
- Underground Electric Wire Laying Worker
Related Jobs
- Communication Line Laying Worker
- Licensed Electrician
- Overhead Electric Wire Installation Worker