Underground Distribution Line Laying Worker

ちちゅうはいでんせんふせつさぎょういん

Industry & Occupation

Architecture, Civil Engineering & Facilities

Classification

Summary

Underground distribution line laying workers lay distribution cables underground under the instructions of power companies and others to construct and maintain distribution infrastructure. This is a specialized profession.

Description

Underground distribution line laying workers perform a series of operations in the underground conversion or renewal of distribution networks, from trench excavation to conduit laying, cable pulling, jointing, concrete encasement, and road surface restoration. They are required to operate heavy machinery, perform surveying, handle power cables, manage on-site safety, and coordinate with construction supervisors. Selecting construction methods based on soil conditions and obstacles, as well as quick responses to unforeseen troubles, are also important.

Future Outlook

With the growing demand for renewing aging power infrastructure and the spread of renewable energy, the demand for laying underground distribution lines is increasing. Advancements in safety improvements and unmanned technologies are also progressing, and the expertise of technicians is expected to be valued even more.

Personality Traits

Cautious and meticulous / Good cooperativeness / Physically fit / Strong sense of responsibility

Work Style

Day shift / On-site stationed / Outdoor work / Safety equipment required / Shift work

Career Path

Apprentice worker → Skilled worker → Foreman worker → Construction management technician → Site supervisor

Required Skills

Cable connection / Conduit laying and cable pulling / Excavation and restoration using trenching method / Heavy equipment operation / Surveying (level measurement)

Recommended Skills

CAD (wiring route diagram creation) / Concrete injection technology / Safety and health management / Underground exploration technology

Aptitudes (Strengths Preferred)

Item Description
Adaptability Quick adaptation to changes in weather and ground conditions is necessary
Attention to Detail & Accuracy Because misalignment of cable laying positions can lead to obstacles
Physical Stamina & Endurance Physical strength is required for heavy machinery operation and long hours of outdoor work
Problem Solving Because responses to underground obstacles and unexpected situations are required
Stress Tolerance Because there is significant pressure from deadlines and environmental changes
Collaboration & Teamwork Because work is performed in cooperation with multiple people

Aptitudes (Weaknesses Acceptable)

Item Description
Creativity & Ideation Because the work follows fixed procedures

Related Qualifications

  • First-Class Electrician
  • Second-Class Electrician
  • Vehicle-Mounted Construction Machinery Operation Skills Training

Aliases

  • Underground Distribution Line Worker
  • Underground Electric Wire Laying Worker

Related Jobs

  • Communication Line Laying Worker
  • Licensed Electrician
  • Overhead Electric Wire Installation Worker

Tags

Keywords