Tunnel Excavation Worker

とんねるくっさくさぎょういん

Industry & Occupation

Architecture, Civil Engineering & Facilities

Classification

Summary

Construction technician who excavates tunnels using shield machines, drill jumbos, etc., and installs support structures and ventilation equipment under safety management.

Description

Tunnel excavation workers use methods such as shield machines, drill jumbos, and blasting excavation to excavate tunnel structures for roads, railways, water supply, etc. Based on geological survey results, they select excavation methods, ensure face stability, and perform safety management including ventilation, drainage, and support installation while proceeding with the work. They divide a wide range of tasks such as heavy equipment operation, support work, surveying, and lining construction support among the team, managing schedule, quality, and safety. Much of the work is in underground environments, requiring knowledge and attention to prevent oxygen deficiency and disasters.

Future Outlook

Stable job openings are expected due to increasing demand for infrastructure maintenance and renewal, while labor shortages and the introduction of automation technologies will increase the market value of workers with advanced safety management and machine operation skills.

Personality Traits

Able to appropriately assess dangers / Calm demeanor / Good team player / Physically fit / Strong sense of responsibility

Work Style

On-site work / Outdoor work / Possibility of long hours / Shift work / Team work

Career Path

Excavation Operator → Site Agent Assistant → Civil Engineering Construction Manager → Construction Supervisor → Project Manager / Site Agent

Required Skills

Blasting Excavation Techniques / Heavy Equipment Operation / Safety Management Knowledge / Support Structure Installation / Surveying Techniques

Recommended Skills

Basic Geological Knowledge / CAD (Construction Drawing Interpretation) / English (For Overseas Projects) / Machine Maintenance / NATM Method

Aptitudes (Strengths Preferred)

Item Description
Adaptability Necessary to flexibly respond to changes in geological conditions and construction methods.
Attention to Detail & Accuracy High attention to detail is required because small mistakes can lead to serious accidents.
Physical Stamina & Endurance Physical stamina is needed to endure long hours of heavy labor and underground work.
Problem Solving Required due to the need for quick response to geological changes and machine troubles.
Stress Tolerance High stress tolerance is required for confined space work and heavy equipment operation.
Collaboration & Teamwork Team coordination is essential for safety assurance and efficient work.

Aptitudes (Weaknesses Acceptable)

Item Description
Creativity & Ideation Less opportunity to demonstrate creativity as work follows established procedures.
Numerical & Quantitative Analysis Advanced numerical analysis is minimal; basic surveying skills are sufficient.

Related Qualifications

  • Slinging Operation Training Course
  • Small Mobile Crane Operation Training Course
  • Special Education for Excavation Work in Rock Formations
  • Special Education for Oxygen Deficiency Hazard Work
  • Vehicle-Mounted Construction Machinery Operation Training Course

Aliases

  • Excavation Worker
  • Shield Machine Operator
  • Tunnel Worker

Related Jobs

  • Adit Excavation Worker
  • Civil Engineering Construction Manager
  • Civil Engineering Laborer
  • Shield Machine Operator

Tags

Keywords