Soil Excavation Worker

さいどさぎょういん

Industry & Occupation

Architecture, Civil Engineering & Facilities

Classification

Summary

Occupation involving the extraction of earth and sand such as gravel, sand, and clay using heavy machinery or manual labor, followed by transportation, sorting, and quality control. Plays an important role as a supplier of construction materials.

Description

Soil excavation workers extract earth and sand such as gravel, sand, and clay used in construction and paving works on-site, sort them to specified particle sizes and quality, and supply them. They operate heavy machinery such as bulldozers, backhoes, and dump trucks, handling tasks from excavation to hauling out, loading and storage in stockyards. Additionally, quality control through soil tests and standard penetration tests, consideration for the surrounding environment, and safety and health management are included in the duties. Work is mainly outdoors, requiring adaptability to weather and terrain conditions.

Future Outlook

While stable job openings are expected due to increased infrastructure development and construction demand, advancements in mechanization and automation, as well as movements for labor environment improvements, may have an impact.

Personality Traits

Has Cooperativeness / Has Physical Strength / Is Cautious

Work Style

Outdoor Work / Seasonal Fluctuations / Shift Work / Team Work

Career Path

Heavy Equipment Operator → Chief Operator → Site Supervisor → Construction Management Technician → Construction Company Manager

Required Skills

Basic Surveying Knowledge / Heavy Equipment Operation / Safety and Health Knowledge / Standard Penetration Test

Recommended Skills

Civil Engineering Construction Management / Environmental Conservation Knowledge

Aptitudes (Strengths Preferred)

Item Description
Physical Stamina & Endurance Because it involves continuous heavy labor including heavy machinery operation and loading/unloading outdoors.

Aptitudes (Weaknesses Acceptable)

Item Description
Analytical & Logical Thinking Because advanced logical thinking is not required.
Creativity & Ideation Because the work centers on following established procedures rather than creative ideas.
Numerical & Quantitative Analysis Because complex mathematical analysis is hardly required.

Related Qualifications

  • Forklift Operation Skills Training
  • Small Mobile Crane Operation Skills Training
  • Vehicle-Mounted Construction Machinery Operation Skills Training

Aliases

  • Clay Extraction Worker
  • Gravel Extraction Worker
  • Sand Extraction Worker

Related Jobs

  • Civil Engineering Worker
  • Quarry Worker
  • Underground Worker

Tags

Keywords