Slope Protection Worker (Turf Laying Construction)
ほうめんほごこう(しばばりこうじ)
Industry & Occupation
Classification
Summary
Specialized worker who lays turf on slopes and embankments to prevent soil erosion and improve landscape greening.
Description
Slope protection workers (turf laying construction) are specialists who lay turf on embankments such as roadsides, river levees, and slopes from land development to prevent soil erosion and preserve landscapes. They handle a series of tasks on-site, including ground leveling, soil improvement, installation of drainage facilities, laying of seedling turf or rolled turf, watering management, and curing. Work is often outdoors on sloped terrain, requiring physical strength and precise technical skills. Since it is team-based work, communication and collaboration are also important.
Future Outlook
With increasing demand for environmental conservation and landscape greening, there is stable demand, but a shortage of workers is a challenge.
Personality Traits
Likes outdoor work / Meticulous / Physically strong / Team player
Work Style
On-site Stationed / Outdoor Work / Seasonal Fluctuations / Team-based
Career Path
Site Worker → Chief → Site Foreman → Landscaping Construction Manager → Independent Business
Required Skills
Slope Shaping / Soil Management Technique / Turf Laying Technique / Watering and Drainage Management
Recommended Skills
Basic Surveying Knowledge / CAD (Construction Drawing Creation) / Landscaping Construction Manager
Aptitudes (Strengths Preferred)
| Item | Description |
|---|---|
| Attention to Detail & Accuracy | Because uniform turf placement and gap-free finishes are required. |
| Physical Stamina & Endurance | Because heavy materials are handled outdoors for long periods of time. |
| Collaboration & Teamwork | Because multiple people need to cooperate to efficiently advance construction. |
Aptitudes (Weaknesses Acceptable)
| Item | Description |
|---|---|
| Analytical & Logical Thinking | Because work procedures follow standards and manuals. |
| Creativity & Ideation | Because construction accuracy is prioritized over original ideas. |
| Numerical & Quantitative Analysis | Because quantity management and simple measurements are the main tasks. |
Related Qualifications
- Aerial Work Platform Operation Skill
- Forklift Operation Skill
- Landscaping Construction Manager (Grade 2/1)
Aliases
- Slope Protection Worker
- Turf Layer
Related Jobs
- Civil Engineering Construction Manager
- Greenkeeper
- Landscaper