Sewerage Pipe Laying Worker

げすいどうかんしきせつさぎょういん

Industry & Occupation

Architecture, Civil Engineering & Facilities

Classification

Summary

Field worker who continuously performs trench excavation for sewer pipelines, pipe assembly and joint construction, backfilling, and related tasks.

Description

Sewerage pipe laying workers excavate trenches (grooves) in roads and ground, and handle field work to assemble sewer pipes at precise gradients. They perform excavation through on-site surveying and heavy equipment operation, apply waterproofing treatment to pipe joint sections, and then conduct backfilling. During construction, they pay attention to changes in weather and geology, contact with existing infrastructure, while engaging in safety and quality management. Team coordination is essential, and they conduct regular inspections and tests to ensure drainage performance after completion.

Future Outlook

Stable demand is expected due to the need to replace aging sewer pipes. On the other hand, skill enhancement is required due to advances in labor-saving construction methods and robotization.

Personality Traits

Attentive / Good team player / Physically fit / Strong sense of responsibility

Work Style

Direct to/from site possible / Fixed-term employment / On-site stationed / Shift work

Career Path

Apprentice Worker → Worker → Lead Worker → Site Agent → Civil Engineering Construction Manager

Required Skills

Heavy Equipment Operation / Pipe Joint Construction / Surveying (Level Measurement) / Trench Excavation / Waterproof Sealant Application

Recommended Skills

CAD Design (Piping) / Quality Management / Safety and Health Management / Sludge Treatment

Aptitudes (Strengths Preferred)

Item Description
Adaptability Need to flexibly respond to changes in weather and site conditions.
Attention to Detail & Accuracy High attention to detail is required for pipe gradients, joint waterproofing, etc.
Physical Stamina & Endurance Requires physical strength for transporting heavy pipes and long hours of outdoor work.
Problem Solving Response to geology and obstacles on site is necessary.
Stress Tolerance High physical and mental stress under constraints of weather and schedules.
Collaboration & Teamwork Coordination with crane operators and other workers is essential.

Aptitudes (Weaknesses Acceptable)

Item Description
Creativity & Ideation The work is routine, with little opportunity for creativity.

Related Qualifications

  • Civil Engineering Construction Manager (Grade 2/1)
  • Oxygen Deficiency and Hydrogen Sulfide Hazard Work Supervisor
  • Sewerage Drainage Facility Works Responsible Engineer

Aliases

  • Culvert Laying Worker
  • Sewer Pipe Worker

Related Jobs

  • Civil Engineering Worker
  • Pipe Worker
  • Sewerage Works Construction Manager

Tags

Keywords