Power Meter Replacement Worker (Including Wiring Work)
でんりょくメータとりかえこう(はいせんこうじをともなうもの)
Industry & Occupation
Classification
Summary
A technical job that performs wiring work as necessary during power meter replacement operations and safely and accurately replaces measuring instruments.
Description
Power meter replacement workers are specialized technicians who, when replacing power meters in homes, buildings, and other facilities with new meters, perform wiring work accompanying meter removal and installation, safety inspections, and energization tests. They read wiring diagrams and construction drawings, measure voltage and insulation resistance using testers, and carry out construction compliant with laws and standards. They also handle work in high places and confined spaces, customer interactions, and coordination with related departments.
Future Outlook
With the spread of smart meters, demand will remain stable. Acquiring IoT and remote maintenance technologies will increase market value.
Personality Traits
Cautious / Cooperative / Likes physical work / Strong sense of responsibility
Work Style
Contract Employee Possible / Direct to/from Work Allowed / On-Site Work / Outdoor Work / Shift Work
Career Path
Apprentice Technician (Assistant) → Power Meter Replacement Worker → Team Leader → Safety Manager → Construction Management Technician
Required Skills
Customer Service / Insulation Treatment / Reading Construction Drawings / Use of Measuring Instruments / Wiring Work
Recommended Skills
High-Place Work Skills / IT Skills (Data Management) / Safety Management / Smart Meter Knowledge
Aptitudes (Strengths Preferred)
| Item | Description |
|---|---|
| Attention to Detail & Accuracy | Wiring connection errors or measurement inaccuracies can lead to accidents and troubles. |
| Physical Stamina & Endurance | Heavy equipment must be carried, and there is a lot of prolonged standing work and confined space work. |
Aptitudes (Weaknesses Acceptable)
| Item | Description |
|---|---|
| Creativity & Ideation | Work procedures are standardized, so there is little need for generating new ideas. |
| Numerical & Quantitative Analysis | Advanced mathematical analysis is not required for metering and standards compliance. |
Related Qualifications
- First-Class Electrician
- Second-Class Electrician
Aliases
- Meter Replacement Worker
- Power Meter Replacement Technician
Related Jobs
- Distribution Line Worker
- Electrical Construction Worker
- Electrical Equipment Worker
- Electrician