Distribution Board Installation Worker
はいでんばんとりつけさぎょういん
Industry & Occupation
Classification
Summary
Distribution board installation workers are specialists who install distribution boards in electrical equipment of buildings and factories, and perform installation, wiring, and testing to realize branching and control functions of electrical systems.
Description
Distribution board installation workers are responsible for installing distribution boards at construction sites, equipment factories, and plants. They conduct site surveys, install support fittings, fix the panel body, wire and crimp wires and cables, perform insulation and grounding treatments, and build distribution functions for high-voltage and low-voltage systems according to voltage and capacity. After installation, they perform insulation resistance measurements, continuity tests, and live tests to confirm proper operation according to specifications. Team coordination, safety measures, and management of tools and equipment are required.
Future Outlook
With the spread of renewable energy and smart grids, demand for distribution board installation workers will remain stable. The introduction of IoT devices and digital control panels will require more advanced skills and knowledge.
Personality Traits
Cautious / Good team player / Meticulous / Strong sense of responsibility
Work Style
Direct to/from site / Full-time / On-site work / Shift work / Team work
Career Path
Apprentice worker → Distribution board installation worker → Leader → Site supervisor → Electrical equipment construction management technician
Required Skills
Distribution board assembly / Insulation and grounding work / Reading electrical drawings / Tool usage / Wire and cable handling
Recommended Skills
CAD (Electrical circuit diagrams) / Operation of high-voltage equipment / PLC control / Reading English documents
Aptitudes (Strengths Preferred)
| Item | Description |
|---|---|
| Attention to Detail & Accuracy | Because wiring mistakes or poor insulation can lead to serious accidents. |
| Physical Stamina & Endurance | Because physical strength is required for handling heavy objects and on-site work. |
| Problem Solving | Necessary for investigating causes in cases of miswiring or equipment malfunctions. |
Aptitudes (Weaknesses Acceptable)
| Item | Description |
|---|---|
| Creativity & Ideation | Creativity is low because work follows instructions and drawings. |
| Numerical & Quantitative Analysis | Advanced mathematical abilities are not required, only simple measurements and torque management. |
Related Qualifications
- First-Class Electrician
- Second-Class Electrician
Aliases
- Distribution Board Installation Worker
- Distribution Board Installer
- Distribution Panel Installation Worker
Related Jobs
- Electrical Wiring Worker
- Low-Voltage Electrical Construction Worker
- Receiving and Distributing Equipment Worker