Pile Form Assembler (Concrete Pile)
ぱいるがたくみこう
Industry & Occupation
Classification
Summary
Specialized job in concrete pile foundation work that assembles and installs steel or wooden formwork inside piles and dismantles it after placement.
Description
Pile Form Assemblers (Concrete Piles) assemble and install formwork (forms) used in pile foundation work in civil engineering construction according to construction drawings. They connect steel or wooden panels, seal gaps, and pour concrete. After pouring, they wait for the specified curing time, then dismantle and remove the formwork to prepare for the next steps such as backfilling soil or inserting rebar. The work is mainly outdoors, requiring coordination with cranes and heavy machinery, work at heights, and adaptation to weather changes. Meticulous inspection is essential for safety management and quality control, and this job emphasizes teamwork and physical stamina.
Future Outlook
Stable demand is expected due to infrastructure development and renewal needs, but training young workers is a challenge due to the aging of skilled workers.
Personality Traits
High safety awareness / Meticulous / Physically fit / Strong sense of responsibility / Team-oriented
Work Style
Contractor/Subcontractor / Direct employment / On-site work / Outdoor work / Shift work
Career Path
Apprentice Pile Form Assembler → Pile Form Assembler → Site Supervisor Assistant → Civil Engineering Construction Manager → Construction Manager
Required Skills
Basic Knowledge of Crane Slinging / Construction Drawing Reading / Formwork Assembly and Dismantling Technology / Hand Tool Operation / Sealant Handling
Recommended Skills
2D CAD Operation / Basic Foreign Language Communication / Site Safety Management / Surveying Knowledge
Aptitudes (Strengths Preferred)
| Item | Description |
|---|---|
| Attention to Detail & Accuracy | Because gaps or misalignments in formwork can cause concrete leakage or quality degradation. |
| Physical Stamina & Endurance | Because there is a lot of carrying and assembling heavy objects, requiring sustained physical strength. |
| Stress Tolerance | Required for work at heights, heavy labor, and under changing weather conditions. |
| Collaboration & Teamwork | Because coordination is essential when handling large members. |
Aptitudes (Weaknesses Acceptable)
| Item | Description |
|---|---|
| Analytical & Logical Thinking | Because site work is the main focus rather than complex logical thinking. |
| Creativity & Ideation | Because existing formwork is often used and new designs are rare. |
| Numerical & Quantitative Analysis | Because numerical calculations are limited to checking measurement values. |
Related Qualifications
- Forklift Operation Skills Training
- Formwork Shoring Constructor
- Slinging Skills Training
- Small Mobile Crane Operation Skills Training
Aliases
- Concrete Pile Worker
- Pile Worker
Related Jobs
- Civil Engineering Construction Manager
- Concrete Placement Worker
- Form Carpenter
- Reinforcing Bar Worker