Concrete Formwork Worker (Construction)

こんくりーとがたいれこう

Industry & Occupation

Architecture, Civil Engineering & Facilities

Classification

Summary

A civil engineering and construction worker responsible for assembling formwork, installing temporary supports, form removal, etc., in the construction of concrete structures.

Description

Concrete formwork workers perform specialized tasks at civil engineering and architecture sites, assembling formwork to shape concrete structures, installing shoring, and removing formwork after concrete pouring. Precise dimension management in line with design drawings and specifications, and shoring plans for safety assurance are required. Collaborative work with multiple people is the norm, playing a vital role in pouring efficiency and quality.

Future Outlook

Due to the rebuilding of aging infrastructure and urban development demand, demand for formwork workers will remain stable. Skill succession and ICT utilization for efficiency improvements are expected to advance.

Personality Traits

Attentive / Good Team Player / High Safety Awareness / Physically Fit / Strong Sense of Responsibility

Work Style

Daily or Monthly Pay / Outdoor Work / Shift Work / Site-Based / Team Work

Career Path

Formwork Assistant → Concrete Formwork Worker → Foreman/Site Leader → Construction Management Technician → Site Supervisor

Required Skills

Blueprint Reading / Formwork Assembly and Dismantling Skills / Marking Out / Safety Management / Scaffolding Work

Recommended Skills

Basic CAD Knowledge / Concrete Knowledge / Construction Machinery Operation / Quality Control / Team Management

Aptitudes (Strengths Preferred)

Item Description
Attention to Detail & Accuracy To accurately maintain the dimensions and slope of concrete.
Physical Stamina & Endurance Because it involves handling heavy materials and long hours of work.
Collaboration & Teamwork Because formwork is assembled and dismantled by multiple people.

Aptitudes (Weaknesses Acceptable)

Item Description
Creativity & Ideation High creativity is not required as it follows standard procedures.
Numerical & Quantitative Analysis Few complex calculations, only simple measurements.

Related Qualifications

  • Formwork and Shoring Work Supervisor
  • Mobile Construction Machinery Operation Training
  • Slinging Skills Training

Aliases

  • Concrete Formwork Worker
  • Formwork Laborer
  • Formwork Worker

Related Jobs

  • Civil Engineering Laborer
  • Concrete Worker
  • Construction Laborer
  • Formwork Carpenter
  • Reinforcing Bar Worker

Tags

Keywords