Architecture, Civil Engineering & Facilities × Career Path: Site Agent
98 matching jobs found.
Distribution Line Laying Worker
Electrical construction technician who lays high- and low-voltage distribution lines on utility poles or underground cables and performs inspections and maintenance.
Pipe Coater
Specialized construction worker who applies insulation and heat-retaining materials to pipes in plants and buildings to prevent heat loss and condensation.
Ballast Extractor
Civil engineering and mining worker who extracts, processes, and transports crushed stone (ballast) used for railway track foundations on site.
Carrier Wave Communication Equipment Installer
Carrier wave communication equipment installers are specialized construction technicians who install carrier wave communication equipment such as microwaves on communication towers and buildings, and perform adjustments and measurements.
Building Scaffolder
Specialist who safely assembles and dismantles temporary scaffolding at construction sites for buildings and commercial facilities, supporting high-altitude work.
Shotcrete Worker
Civil engineering worker who uses specialized machinery to spray high-pressure concrete or mortar onto construction surfaces for tunnel lining, wall repairs, and forming waterproof and wear-resistant layers.
Spray Painter (Architectural Painting)
Spray Painter (Architectural Painting) is a specialized technical profession that uses spray guns or airless equipment to uniformly apply paint to the exterior and interior walls of buildings.
Breaker Operator
A technical job that operates construction machinery equipped with a hydraulic breaker to crush and demolish bedrock, concrete, and other materials.
Boiler Insulation Worker
Specialized technical job that covers boilers and pipes with insulation materials and metal plates to prevent heat loss.
Boring Machine Operator
Construction machinery operator who operates boring machines to perform ground surveys and excavation work for foundation piles. Responsible for preliminary preparations necessary for sample collection and pile installation while maintaining appropriate hole positions and depths.